摘要 |
The paving (10) is formed by at least two irregular shape stones arranged along a first length direction line. The width of the paving is substantially constant and extends along a second light at right angles to the first line. Each stone has an upper surface (14) acting as a wear surface and a lower surface (16) acting as a support surface. The upper surfaces lie in a substantially first common plane (P1) and when the stones are joined together by mortar (20), the latter will cover at least the lower surfaces, forming a second common plane (P2) substantially parallel to the first common plane. An Independent claim is also included for a method for laying the paving. |