发明名称 AUXILIARY METHOD OF MOUNTAIN TUNNEL CONSTRUCTION METHOD
摘要 PROBLEM TO BE SOLVED: To contrive the improvement of a function by using a composition comprising (meta)acrylic acid metallic salt and the other prescribed material as a grout composition for ground. SOLUTION: A composition comprising the univalent or bivalent metal salt of (meth)acrylic acid, water soluble compound having an oxyalkylene group and two or more (meth)acryloyl groups and water is provided as a grout composition. For instance, a plurality of injection pipes 2 are driven into ground along the circumferential direction of the tunnel of a cutting face during execution at a prescribed interval. Next, the grout composition is pushed in the ground from the pipe 2 to be hardened, and after the hardener 3 of the grout composition is formed, working excavating the tunnel is repeated. In this case, a fore- poling method or a fore-piling method is preferable. Thereby the problem of combustibility and skin stimulativeness can be dissolved, since it has low viscosity, permeability can be improved, quickly hardened, strength can be improved, and initial effect can be held for a long time.
申请公布号 JP2000248876(A) 申请公布日期 2000.09.12
申请号 JP19990048197 申请日期 1999.02.25
申请人 TOAGOSEI CO LTD 发明人 TAKEDA SHINJI;FUKUSHIMA KOICHI
分类号 E21D9/04;C09K8/50;C09K8/56;C09K17/18;C09K103/00;(IPC1-7):E21D9/04;C09K7/02 主分类号 E21D9/04
代理机构 代理人
主权项
地址