摘要 |
PROBLEM TO BE SOLVED: To save assembling labor by lifting up a frame body assembled on a first-story floor framing, and combining the frame body with a portion inside a girt. SOLUTION: A frame body 3 made up of square pipes, H steels, angles, laminated lumbers, etc., is assembled. The frame body 3 is lifted up by using a wall or a column 4, and combined with a portion inside a girt 6. Further, a beam 7 is mounted on the frame body 3, followed by laying a floor member 8 on the same. Thus, labor of assembling a floor of a building at a high altitude can be eliminated.
|