摘要 |
PROBLEM TO BE SOLVED: To improve earthquake resisting performance by extending a through beam between posts constituting a building in a building hard to be reinforced against an earthquake because a production line or the like becomes an obstacle. SOLUTION: In an existing building 1 where a belt conveyer 2 is disposed inside and a forklift 4 travels on the floor surface 2, for example, a through beam 5 is extended between posts constituting the building 1 to connect the posts to each other. Accordingly, the apparent floor height becomes smaller so that load shearing force of the post can be increased. Secondly, a carbon fiber sheet or an iron plate is wound round the periphery of the posts to which the through beam 5 is connected to shearing reinforce the post 6. Thus, the existing building can be reinforced against an earthquake without an obstacle of a production line or a transport line.
|