发明名称 CONNECTING STRUCTURE AND CONNECTING METHOD FOR UNDERGROUND CONTINUOUS WALL AND GUIDE WALL
摘要 PROBLEM TO BE SOLVED: To reduce the construction period and construction cost. SOLUTION: This connecting structure is provided with guide walls 3a, 3b formed at both end sections 2a, 2b in the width direction of a portion where the continuous wall 2 of the ground 1 is to be formed, main reinforcements 6a provided on the guide wall 3a, a connecting recess 12, a reinforcing bar cage 4 arranged in a space 2c forming the continuous wall 2, connecting bars 7a connecting the upper section of the reinforcing bar cage 4 and the main reinforcements 6a, and concrete 16, 17 placed in the space 2c.
申请公布号 JP2000234332(A) 申请公布日期 2000.08.29
申请号 JP19990035589 申请日期 1999.02.15
申请人 SHIMIZU CORP 发明人 KURODA MASANOBU;SUGINO FUMIAKI
分类号 E02D5/20;(IPC1-7):E02D5/20 主分类号 E02D5/20
代理机构 代理人
主权项
地址