摘要 |
installations containing explosives for extermination of fuzes of different types. SUBSTANCE: installation has a heating unit, loading device, unloading device, controlled power supply, fuze detonation monitor sensor, loading sensor, unloading sensor, logic unit. The installation ensures 100-% extermination of each fuze conditioned by the principle laid in it in accordance with which the fuze is found in the heating unit as long as it is required for its complete detonation. EFFECT: enhanced capacity of installation due to its uninterrupted operation. 1 dwg
|