发明名称 CONSTRUCTION OF TUNNEL
摘要 PROBLEM TO BE SOLVED: To provide a tunnel construction method wherewith a period of time required for blocking general traffic can be reduced and noises arising from excavation of the tunnel hardly reach the ground surface. SOLUTION: With this tunnel construction method, two lines of vertical shafts 12, 14 being in parallel with each other are formed. A plurality of refrigerant circulating pipes 20, 22 crossing each other and extending downward respectively from each of the vertical shafts and a refrigerant circulating pipe 24 extending horizontally from one of both of the vertical shafts are arranged in the ground. With a refrigerant made to circulate through the pipes, a pair of opposite side walls 28, 30 and a top wall 32 connecting with both of the side walls each comprising of frozen soil are formed. Then, the ground enclosed with these walls is excavated. The excavation may be executed by an inverted lining method.
申请公布号 JP2000230389(A) 申请公布日期 2000.08.22
申请号 JP19990034014 申请日期 1999.02.12
申请人 KUMAGAI GUMI CO LTD 发明人 TAKAMIZAWA SHIGERU;KIDO YOSHIKAZU
分类号 E21D9/04;E21D13/02;(IPC1-7):E21D9/04 主分类号 E21D9/04
代理机构 代理人
主权项
地址