发明名称 FLUE STRUCTURE FOR FURNACE AND ITS OPERATION METHOD
摘要 PROBLEM TO BE SOLVED: To improve reliability and maintenance of a flue. SOLUTION: There are provided a purge air piping 18, a purge valve 19, and a nozzle 20 which purge primary air taken out from an air flow passage 3 located on the rear flow side of a primary air ventilating machine 2 installed usually in a furnace 6 in an inclined flue 8 located on the upstream side of an electrical dust collector 9 provided on a combustion waste gas flue discharged from the furnace 6 of a pulverized coal-fired boiler and the like. A gas flow speed in the inclined flue 8 is reduced upon low loading of the furnace 6 and purging for prevention of ash deposition is required, so that primary air used for fuel combustion in the furnace 6 is employed as purging gas. Upon high load each purge valve 19 is kept to a specified fine opening, whereby the primary air is supplied into the inclined flue by a small amount to prevent ash from being deposited in the flue 8.
申请公布号 JP2000227212(A) 申请公布日期 2000.08.15
申请号 JP19990027350 申请日期 1999.02.04
申请人 BABCOCK HITACHI KK 发明人 HORI SHIGEKAZU;SUMITA TADASHI
分类号 F23J3/00;F23J3/02;(IPC1-7):F23J3/00 主分类号 F23J3/00
代理机构 代理人
主权项
地址