发明名称 Installation of cable on high voltage overhead cable, involves using suspension rollers to feed cable into cableway, pulling winch cable parallel to cable, and retracting using winch on ground
摘要 The method involves raising the cable (1) from a cable drum (5) on the ground onto a first pylon (6) and pulling it along the cableway with a travelling winch (4) to a remote pylon (15). Suspension rollers (12) feed the cable into the cableway (2) and a winch cable (9) is pulled parallel to the cable and guided by the suspension rollers. The winch cable is retracted by a winch (10) on the ground
申请公布号 DE19857131(A1) 申请公布日期 2000.06.15
申请号 DE19981057131 申请日期 1998.12.11
申请人 ALCATEL, PARIS 发明人 BOEHME, RALPH;KORPORAL, HANS-WERNER
分类号 G02B6/48;H02G1/02;H02G7/05;(IPC1-7):H02G1/02 主分类号 G02B6/48
代理机构 代理人
主权项
地址