发明名称 GROUND IMPROVING METHOD APPLYING TOP-DOWN CONSTRUCTION METHOD
摘要 PROBLEM TO BE SOLVED: To improve the ground just below an underground building frame into a lattice-shaped wall form mainly by sequentially repeating cutting of the ground and construction of underground building frame while constructing a main building frame to the direction of underground, and directly improving the ground just below by means of a small ground improving machine carried at a final floor finishing level, thereby constructing the final floor. SOLUTION: Cutting of the ground and construction of underground building frame constructed of beams 10 and a floor 1 are repeated sequentially downward to proceed the construction of underground part 2 of a building by the top-down construction method. The area from a lowermost floor finishing level L3 to a planned floor finishing level downward therefrom are excavated by a small backhoe or the like carried thereat, and the bottom surface of lowermost floor is 11 taken as a construction floor surface 4. For example, a one-shaft type small ground improving mechine 3 is carried onto the surface 4 from the ground. Then, the ground to be improved 5 just below the surface 4 is excavated to a specified depth D by the machine 3. Thereafter, a ground stabilizing material 7 such as cement slurry or the like is poured therein which is stirred and mixed with the excavated earth to thereby improve the ground to be improved 5.
申请公布号 JP2000160551(A) 申请公布日期 2000.06.13
申请号 JP19980337073 申请日期 1998.11.27
申请人 TAKENAKA KOMUTEN CO LTD;TAKENAKA DOBOKU CO LTD 发明人 SHUDO YASUHIKO;KANAO TAKEHIRO;MITSUMA AKIRA;AKIBA MASAYUKI;TAKAYANAGI KAZUTOSHI;AOKI MASAMICHI;YOSHIZAWA MUTSUHIRO;KONISHI KAZUO;FUCHIGAMI KEIICHI;UEDA KAZU
分类号 E02D3/12;E02D29/045;E21D13/00;(IPC1-7):E02D3/12 主分类号 E02D3/12
代理机构 代理人
主权项
地址