发明名称 SARDINE BONE CONSTRUCTION METHOD FOR LARGE CROSS SECTION TUNNEL
摘要 PROBLEM TO BE SOLVED: To safely and rapidly excavate a large cross section tunnel by previously reinforcing and improving the natural ground over the whole length of a construction area of a tunnel. SOLUTION: After a topped guide pit 2 is excavated to pierce the whole length of a construciton area of a tunnel 1, bend drilling is performed along the peripheral edge of cross section of the tunnel 1 at specified space from the topped guide pit 2. After inserting filling pipes in drilled holes, bent steel pipes 3 are pulled out, and filling material is filled from the filling pipes to construct an artificial natural ground arch 4. The tunnel 1 is then excavated, and a hanging form 6 is advanced to place concrete for secondary lining, thus excavating the tunnel.
申请公布号 JP2000160980(A) 申请公布日期 2000.06.13
申请号 JP19980338023 申请日期 1998.11.27
申请人 NAGATOMO SHIGEKI 发明人 FUJIMOTO HIDEO;KAJI SHIGEHITO;TAKEUCHI HIDEKI;MITARAI YOSHIO;OTSU MUNEOKI;TAKEBAYASHI TSUGIO;OCHIAI MASAKAZU;YAMAMOTO TAKEFUMI;KINOSHITA YOSHITOMO
分类号 E21D9/00;E21D9/04;E21D9/10;E21D11/00;E21D11/10;(IPC1-7):E21D9/04 主分类号 E21D9/00
代理机构 代理人
主权项
地址