摘要 |
PROBLEM TO BE SOLVED: To provide a constructing method for a dome roof capable of reducing cost and efficiently conducting construction in a short period. SOLUTION: For a dome roof, a dome center part 10 and a dome peripheral part 12 are separately composed, and the dome center part 10 and the dome peripheral part 12 are link-jointed at the ground level to be capable of bending at bend points 16. The dome center part and the dome peripheral part 12 are then lifted by cable wires 20 utilizing regular columns 14 installed at peripheral parts to be fixed and supported, thereby the dome roof is constructed.
|