发明名称 EXECUTION OF FOUNDATION AND FOUNDATION STRUCTURE
摘要 PROBLEM TO BE SOLVED: To improve the accuracy of a joint pin easily even at the time of performing cast-in-place at a site of a foundation. SOLUTION: Nuts 25, 26 for adjusting height and a joint pin 27 are screwed successively to an anchor bolt 23 buried into the foundation 21 from a lower section, a cylindrical base-correcting member 32 is installed to the outer circumferences of these nuts and joint pin, an anchor fixture 33 is screwed to the upper section of the joint pin 27, and the part of the anchor fixture 33 is retained to an anchor fixing plate 46 retained to forms 45. Concrete placed into forms 45 is solidified, a digging-in section is formed around the joint pin 27 by removing the base correcting member 32, the upper end of the projecting anchor bolt 23 in the digging-in section is corrected to a formal position, and the digging-in section is buried with a grout material.
申请公布号 JP2000110173(A) 申请公布日期 2000.04.18
申请号 JP19980285522 申请日期 1998.10.07
申请人 SEKISUI CHEM CO LTD 发明人 YASHIRO MINORU
分类号 E02D27/00;E04B1/348;(IPC1-7):E02D27/00 主分类号 E02D27/00
代理机构 代理人
主权项
地址