摘要 |
PROBLEM TO BE SOLVED: To freely decide the setting interval of each after-treating machine and to shorten the shifting time of conveying of a cast product by engaging a pinion gear with a rack, fixing an arm to a rotary shaft of each pinion gear and fitting the upper end of a hang-down rod at the tip part of the arm so as to be freely rotatable and also, a clamper for cast product at the lower end of the hang-down rod. SOLUTION: When the rack plate 11 is arranged through a connecting rod 10 by extending a hydraulic cylinder, the pinion gear 7 is rotated and the arm 14 is rotated. The cast product W is shifted to two times of the length of the arm 14 through the hang-down rod 18 fitted to the tip part of the arm 14 and the cast product clamper 19 and to a post-processing stage. In the cast of being different interval between two sets of the post-processing machines, the length of the arm 14 is changed so as to match to the interval. It is desirable to arrange the rod 15 at the upper part of the arm 14 as a link structure of a parallelogram. When the arm 14 in each shifting device for conveying has different length, this remarkable effect is obtd.
|