发明名称 |
STEEL SETTLER OF PRECAST SUPPORT IN SUPPORT-PILLAR INNER BONDING UNIT AND METHOD THEREOF |
摘要 |
PURPOSE: A steel settler is provided to have an excellent endurance of a bonding unit than before as effectively assembling a pre cast member. CONSTITUTION: A beam-pillar joining structure is composed of a pair of support stands(5) for supporting a vertical center of a lower steel(4) of a beam corresponded by facing to both sides of the part aligned so both pre cast supports(3) of the lower steel(4) as to be corresponded and a fixing bolt(6) for fixing as penetrating lengthwise a pair of supporting stands(5). Herein, the fixing bolt(6) is located between the supportive lower steels(4) to prevent an interference with the support lower steel(4) supporting by a pair of supporting stands(5). While constructing, a pre cast support(3) is produced by establishing concrete after aligning the support front steel(7) on an upper part as aligning the support lower steel(4) rectangularly curved as a specific interval not to be crossed with a main root(2) of a pillar(1).
|
申请公布号 |
KR20000019558(A) |
申请公布日期 |
2000.04.15 |
申请号 |
KR19980037715 |
申请日期 |
1998.09.12 |
申请人 |
KOREA INSTITUTE OF CONSTRUCTION TECHNOLOGY |
发明人 |
YU, YEONG CHAN;LEE, MOON HWAN;CHAE, GEUN DO;KIM, GEUNG HWAN |
分类号 |
E04B1/20;(IPC1-7):E04B1/20 |
主分类号 |
E04B1/20 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|