发明名称 ERECTION OF COMBINED TRUSS BRIDGE
摘要 PROBLEM TO BE SOLVED: To shorten the term of construction by hanging the combined truss beams from bridge piers, installing the execution equipment on truss top chords, mounting a form on the top chords, applying the concrete, and then hanging the beam to the next span. SOLUTION: The combined truss beams are hung between two spans from a bridge pier, execution equipment 13 is installed on a top chord 3 of the beam and a moving form 10 is installed on a bottom chord 4. Then the concrete is applied to the bottom chord 4 position to construct the bottom concrete floor board, and a moving crane 12 is installed on the execution equipment 13. Then the beam of a next span is hung by the crane 12, the execution equipment 13 is installed on the top chord 3 of the beam, and the crane 12 is moved onto the same. Then the beam of one span is hung by the crane 12, a form 10 is installed on a rear top chord 3, the concrete is applied to the top and bottom chords 3, 4 to construct the top concrete floor board 1 and the bottom concrete floor board. Further the hanging of the beam and the application of the concrete are repeated, and the beam is connected to a beam extended from an opposite bridge pier, Whereby the term of construction can be shortened.
申请公布号 JP2000104219(A) 申请公布日期 2000.04.11
申请号 JP19980288681 申请日期 1998.09.28
申请人 NKK CORP 发明人 NAKANISHI KATSUYOSHI;TAKIGUCHI NOBUAKI
分类号 E01D6/00;E01D1/00;E01D2/00;E01D19/00;E01D21/00;E01D101/30;(IPC1-7):E01D21/00 主分类号 E01D6/00
代理机构 代理人
主权项
地址