摘要 |
PURPOSE: A concrete synthetic slab system is provided to increase a usage span by the self-weight reduction of synthetic slab, also to reduce frame construction cost by the reduction of section of a lower support structure. CONSTITUTION: A production method of a concrete synthetic slab system has the steps of: connecting a deck plate by a connection device formed at both sides, settled at a frame or at a beam; constituting the deck plate as a prominence and depression structure projected in a specific interval; forming a projection hanging unit(12b) where the 1st hanger hole is to be established by being curved at the lower part of the projection projected upward; establishing a welding steel net at the upper part of the deck plate having a reverse trapezoid groove where the 2nd hanger hole(15) is to be combined at the lower face of the middle of the recessed part of the deck plate.
|