摘要 |
PROBLEM TO BE SOLVED: To provide a method for constructing bar arrangement for a floor which improves operability and shortens a term of work and also which enables execution of uniform bar arrangement for the floor and construction of a concrete floor having a high strength. SOLUTION: A deck 1 with bar arrangement which is prepared by a process wherein lattice materials 3 formed by bending bars in corrugation are joined to the top of a rectangular deck plate to be a waste form, along the lengthwise direction thereof, and an upper longitudinal main reinforcement 4 is joined to these lattice materials 3 along the upper parts thereof is disposed in a plurality to be flat along a plane whereon a floor is formed, and then a mesh 10 prepared by joining lateral main reinforcements 11 and a waste reinforcement 12 intersecting these perpendicularly, in the shape of a grille, is put on the top of the upper longitudinal main reinforcement 4 of the deck 1 with bar arrangement disposed to be flat, so that the lateral main reinforcements 11 and the reinforcement 4 intersect each other perpendicularly. Subsequently, the upper longitudinal main reinforcement 4 of the deck 1 with bar arrangement and the lateral main reinforcements 11 of the mesh 10 intersecting it perpendicularly are bound together by wires 14.
|