摘要 |
PROBLEM TO BE SOLVED: To provide a coin introduction path for hardly generating coin clogging. SOLUTION: This cylindrically formed coin introduction path 1 is composed of a bottom wall 2 provided with a bottom surface 2a for forming the slope of a prescribed grade, two side walls 3 and 4 connected to the bottom wall 2 for forming the passage of a prescribed width and an upper wall 5 connected to the side walls 3 and 4. On the side wall 4, a guide member 10 in contact with a coin surface with a small area is provided. The side walls 3 and 4 are formed by being inclined at a prescribed angleθ2 to a vertical direction so as not to be mutually horizontally positioned.
|