发明名称 POWER GENERATING SYSTEM
摘要 PROBLEM TO BE SOLVED: To shorten the time required for a deaerator to enter into operating state after ignition by providing a high pressure steam duct with a bypass pipe having a steam regulation valve for introducing steam from a steam generating section to the heating duct side. SOLUTION: A boiler 2 for recovering waste heat being generated through driving of a gas turbine is provided with a high pressure steam generating section 4 and a low pressure steam generating section 5 coupled with a steam turbine 10 through a high pressure duct 6 and a low pressure duct 8, respectively. The steam turbine 10 is coupled, on the outlet side thereof, with the inlet side of a condenser 11 through a coupling pipe 11a. Intermediate part of the high pressure duct 6 is coupled with the intermediate part of the low pressure duct 8 through a bypath 22 for introducing steam from the high pressure steam generating section 4 to a branch pipe 13. A pressure regulation valve 23 and a temperature reducer 24 are coupled to the way of the bypath 22. The time required for a deaerator 14 to enter into operating state after ignition can be shortened by introducing steam to the deaerator 14 through the bypath 22.
申请公布号 JP2000088209(A) 申请公布日期 2000.03.31
申请号 JP19980254450 申请日期 1998.09.09
申请人 HITACHI ZOSEN CORP 发明人 YAMANAMI TAKESHI;INOUE KOSHI;KATO TAKESHI;YANAGI IKUTOSHI
分类号 F22D1/28;(IPC1-7):F22D1/28 主分类号 F22D1/28
代理机构 代理人
主权项
地址