发明名称 |
CONSTRUCTION METHOD OF CONNECTION STEEL REINFORCING INTEGRATION OF BRIDGE STRUCTURE USING PC BEAM |
摘要 |
PURPOSE: The construction method having a good distribution of vehicle load, for repressing the occurrence of shock load, also for preventing the crack generated while constructing the upper slab is provided. CONSTITUTION: The construction method has the steps of: equipping a coupler(23) having a female screw unit(24) formed inside; piercing plural holes(22) at the end of a PC beam(21) to be connected in a specific interval; fixing by inserting the coupler(23) into the hole(22); forming a male screw unit(26) at a steel reinforcing to be connected; combining the male screw unit(26) of the steel reinforcing into the female screw unit(24) of the coupler(23); distributing a bar with a shape of a steel reinforcing(25) using a steel reinforcing for enabling to be curved; establishing a concrete at the connection unit(27) of a bridge.
|
申请公布号 |
KR20000012866(A) |
申请公布日期 |
2000.03.06 |
申请号 |
KR19980031411 |
申请日期 |
1998.08.01 |
申请人 |
DONG AH CONSTRUCTION INDUSTRIAL CO., LTD. |
发明人 |
YOO, SUNG KEUN;LEE, JAE HYUK;PARK, JONG MYUN |
分类号 |
E01D2/02;(IPC1-7):E01D2/02 |
主分类号 |
E01D2/02 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|