发明名称 METHOD AND SYSTEM FOR AUTOMATIC SCHEDULE GENERATION
摘要 PROBLEM TO BE SOLVED: To provide a method and system which automatically generate a schedule of plural operation items. SOLUTION: The period from the operation start day to the date of final delivery is divided into several periods according to the name, operation period, date of delivery, priority, operation start day, and operation time per day which are inputted as to each operation item as an object to be scheduled and when only one operation item is present in some period, the operation item is assigned to the whole period. As for a period wherein there are plural operation items, a process for assigning the operation item of the highest priority to the period where the operation item of the lowest priority in the period including the operation items is assigned is repeated until the allocation of the operation times of all the operation items is completed to automatically generate the schedule.
申请公布号 JP2000057224(A) 申请公布日期 2000.02.25
申请号 JP19980229214 申请日期 1998.08.14
申请人 NEC CORP 发明人 YAMAMOTO TOMOHIDE
分类号 B23Q41/08;G05B15/02;G05B19/418;G06Q10/00;G06Q10/06;G06Q10/10;G06Q50/00 主分类号 B23Q41/08
代理机构 代理人
主权项
地址