发明名称 SOIL IMPROVEMENT METHOD
摘要 PROBLEM TO BE SOLVED: To provide a method for performing better soil improvement work without increasing an expansion limit of a hollow body arranged underground or the maximum amplitude of a vibrating body. SOLUTION: In the soil improvement work, a hollow body 14 is arranged underground permitting expansion and shrinkage by the supply and discharge of a high pressure fluid, then the hollow body 14 is suddenly expanded and shrunk and a process of supplying sediment or a large amount of granular materials between the hollow body and its surrounding ground 38 after sudden expansion and shrinkage of the hollow body and during the shrinkage or after the shrinkage of the hollow body is repeated. Then, if a vibrating body is used, the vibrating body is arranged underground and sediment and a number of granular substances are supplied between the vibrating body and its surrounding ground.
申请公布号 JP2000054362(A) 申请公布日期 2000.02.22
申请号 JP19980225818 申请日期 1998.08.10
申请人 KUMAGAI GUMI CO LTD 发明人 HAMADA NAOHITO;WATANABE NORIO
分类号 E02D3/08;E02D3/10;(IPC1-7):E02D3/10 主分类号 E02D3/08
代理机构 代理人
主权项
地址