摘要 |
A method for installing a steady rail track, for which the concrete railroad ties, which carry the rails or auxiliary rails and the continuous reinforcement of which protrudes below out of the only partially constructed concrete casing, are pre-installed initially into a rail grid and subsequently lined up positionally over a supporting layer and embedded in a casting composition, the rail grid, with interposing of a supporting reinforcement, which is optionally tied to the underside of the railroad tie reinforcement, being aligned directly over a hydraulically bound supporting layer and the casting composition, preferably using movable, removable side formwork, is applied on the hydraulically bound supporting layer.
|