发明名称 |
INTEGRAL ESTIMATE SYSTEM FOR BUILDING AND INTERIOR CONSTRUCTION |
摘要 |
PROBLEM TO BE SOLVED: To speedily prepare an exact estimate with no personal difference by settling disordered article data owned by respective makers within a uniform format. SOLUTION: The integral estimate system fr building/interior construction is constructed by settling the disordered article data owned by the respective makers within the uniform format. A master article database 14 manages the article data by registering the main information of article items to be used. A master model base 15 registers/manages information required for estimating the destination of stocking, construction or sewing concerning high-frequency articles or additional articles at the destination of a client while abbreviating them into model. A master article type base 16 classifies the information of article data for each article type and registers/manages them. A master item base 17 registers/manages information further precisely classifying the contents of items into item number data for each item. Besides, a master scale calculation base 18 becomes a base for calculating the scale required for estimation and registers/manages the information different by articles or article groups for each client/supplier. |
申请公布号 |
JP2000048071(A) |
申请公布日期 |
2000.02.18 |
申请号 |
JP19990150219 |
申请日期 |
1999.05.28 |
申请人 |
SHIIMAA:KK |
发明人 |
SHIMA HIDEO;HORIUCHI MASANORI |
分类号 |
G06Q30/06;G06Q50/00;G06Q50/08 |
主分类号 |
G06Q30/06 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|