发明名称 EXECUTION METHOD OF HANDRAIL FOR PASSENGER CONVEYER
摘要 PROBLEM TO BE SOLVED: To complete repair work of a handrail in a day by carrying an inner deck, after it is removed, to a site separate from a job site, carried into the job site after a surface reprocessing treatment is performed, also in parallel to this operation performing surface treatment of an outer deck in the job site, and then performing mounting work of the inner deck. SOLUTION: In execution of a handrail, first an inner deck 6 is removed, it is carried to a site separate from a job site. And then, after applying a surface reprocessing treatment relating to the inner deck 6, it is again carried into the job site. On the other hand in a field, in parallel to a process from carrying out to the surface reprocessing treatment and carrying in of the inner deck 6, an outer deck 7, placed in a condition has removed a side member 4, is painted with metal use one coat paint. Thereafter, re-assembly of the inner deck 6 is performed by mounting the side member 4. Since the surface reprocess treatment is thus performed by carrying the inner deck 6 to the site separate from the job site also, and in parallel to this operation, surface painting treatment of the outer deck 7 is performed, repair work of the handrail in a passenger conveyer can be performed in a single day.
申请公布号 JP2000016739(A) 申请公布日期 2000.01.18
申请号 JP19980191957 申请日期 1998.07.07
申请人 HITACHI BUILDING SYSTEMS CO LTD 发明人 YAMAMOTO KOJI;MATSUZAKI YOSHIO
分类号 B66B23/22;(IPC1-7):B66B23/22 主分类号 B66B23/22
代理机构 代理人
主权项
地址