发明名称 FORMATION METHOD OF UNDERGROUND PILE AND FORMATION MONITORING MECHANISM THEREOF
摘要 PROBLEM TO BE SOLVED: To provide a formation method of an underground pile and a formation monitoring mechanism thereof capable of decreasing a sludge moving quantity while taking advantage of a good feature of a conventional example and settling damage to an injection pipe caused by abrasion. SOLUTION: A monitoring mechanism 7 is built in the lower part of a hardener injection pipe 5, a hardener G is continuously jetted from a jet nozzle 7a of a jet pipe attached to the monitoring mechanism 7 in the direction of a radius of the hardener injection pipe 5, the hardener injection pipe 5 is pulled up to drive while swinging and driving the hardener injection pipe 5, the peripheral ground is cut with turning jet of compressed air A and the hardener G to be continuously jetted, an unsolidified pile P is formed in the cut area 11, and a foundation structural body 13 is formed in the ground by solidifying the unsolidified pile P. The jet pipe is constituted of a rigid stirring rod 20, and a bedrock in a rod swing area is so constituted that it can be directly excavated by the stirring rod 20.
申请公布号 JP2000001847(A) 申请公布日期 2000.01.07
申请号 JP19980164836 申请日期 1998.06.12
申请人 KANEKO YUJI 发明人 KANEKO YUJI
分类号 E02D3/12;(IPC1-7):E02D3/12 主分类号 E02D3/12
代理机构 代理人
主权项
地址