摘要 |
FIELD: production of polyethylene tubes. SUBSTANCE: process includes positioning of longitudinal metal fitting on mandrel, winding of lateral fitting on it with specified spacing, fixing of fittings in crossing points, formation of polyethylene sheath and division of continuous tube into sections of measured length. Winding at start and finish of measured length is conducted with spacing of t<SB>1</SB> between turns which value meets relationship <EMI ID=0.507 HE=6 WI=15 TI=CHI>, where d is diameter of lateral fitting that is followed by threading on these sections. EFFECT: reduced labor input and saving of consumable materials. 1 cl, 2 dwg
|