发明名称 PRODUCTION OF NC DATA
摘要 <p>PROBLEM TO BE SOLVED: To prevent a working waiting state from occurring by automatically executing a CAM system in order to successively produce NC data to a working work described on working loading information which is newly produced and added. SOLUTION: Whenever a production plan is newly produced, a working loading system 1 updates a working loading information file 8 and sends a start request to an automatic CAM execution system 2. In such a case, the file 8 is opened, a CAD data name that is uniquely identified from a drawing number is extracted and a CAM system name is extracted from a described machine tool number by referring to a CAM information management table 5. Next, the CAD data name is designated as input data and NC data is produced by actually starting a CAM system 4 of the extracted CAM system name. NC data corresponding to all working works is successively rewritten and updated by repeating such processing.</p>
申请公布号 JPH11327622(A) 申请公布日期 1999.11.26
申请号 JP19980137996 申请日期 1998.05.20
申请人 TOSHIBA FA SYST ENG CORP;TOSHIBA CORP 发明人 MIYAMOTO NAOKI;SUZUKI MIKIKO
分类号 B23Q15/00;B23Q41/08;G05B19/18;G05B19/4097;G05B19/4155;G05B19/418;(IPC1-7):G05B19/415;G05B19/409 主分类号 B23Q15/00
代理机构 代理人
主权项
地址