发明名称 SCHEDULE PLAN AND PREPARATION MANAGING SYSTEM
摘要 PROBLEM TO BE SOLVED: To easily generate, correct and change a schedule plan by deciding the delivery required days of respective sub-units from read times by means of each work process, extending the schedules of respective parts in the sub- units, deciding the order days of the respective parts and executing a preparation processing. SOLUTION: This schedule extension master generating processing 5 of a schedule plan processing part 211 generates a schedule extension master by a machine kind 105 provided with the read times summed-up by work process and a standard time by the various combinations and registers it by relating a parts constituting master 101 to a shop constituting master 103 by a shop code. A preparation processing part 212 decides the delivery required days of the respective sub-units by the read times by work process in the master 105. Then, the schedule of the parts constituting master 101 is extended by each sub unit, and the order days and delivery days of the respective parts are decided so as to permit the respective parts of the sub-units to be delivered until the delivery required day.
申请公布号 JPH11312197(A) 申请公布日期 1999.11.09
申请号 JP19980120205 申请日期 1998.04.30
申请人 HITACHI LTD 发明人 OYAMA AKIHIRO
分类号 G05B19/418;B65G61/00;G06F19/00;G06Q10/08;G06Q50/00;G06Q50/04;G06Q50/28 主分类号 G05B19/418
代理机构 代理人
主权项
地址