摘要 |
The operator of a nuclear steam supply system manually selects a lineup of either one, two, or three main feedwater pumps for normal reactor operation to generate power. This selection sets or resets a status latch for each pump, representative of intended pump operation. A system (RPCS) for implementing a step reduction in the power output of the reactor, includes an associated logic circuit which combines signals indicative of tripping of one or more pumps, with the pump status latches, to achieve the following outcomes: (a) with one pump selected, a trip of this one pump does not produce an RPCS trip demand signal (because the reactor will be tripped); (b) with two pumps selected, (i) a trip of one pump will produce an RPCS trip demand signal, whereas (ii) a trip of these two pumps will not produce an RPCS trip demand signal; (c) with three pumps selected, (i) a trip of one pump will not produce an RPCS trip demand signal (because the transient can be handled by the basic control system), (ii) a trip of two pumps will produce an RPCS trip demand signal, and (iii) a trip of three pumps will not produce an RPCS trip demand signal.
|