摘要 |
A method and an arrangement supplies power in a communications network (100) comprising subscriber side (110) and a provider side (120), the provider side being connected to nodes of the subscriber side through one or more Line Terminals (LT1, . . . , LTn) and at least one equipment (111-114) at the subscriber side (110) being connected to the provider side (120) through at least one Net Terminal (NT). The arrangement comprises apparatus for supplying power to the communications network (100) at least during a period of time through the at least one Net Terminal from the at least equipment (111-114). |