摘要 |
<p>PROBLEM TO BE SOLVED: To achieve progressive one unit flow production in which unnecessary work of a worker is eliminated by enhancing an operation rate of an automatic guided vehicle, and part supply by the automatic guided vehicle is set for a pace maker. SOLUTION: In a carrying device by an automatic guided vehicle to carry a bogie to a desired section by the automatic guided vehicle with a power device moving along a track line, the guided vehicle dives under the bogie, and a pusher 3 is installed so as to be perpendicularly hung from the bogie, the bogie is forwarded by pushing a rod type traction guide 11 horizontally extending in a lateral direction, the bogie is detached by raising the pusher 3 at the desired section and a detaching rail to detach the bogie by raising the pusher 3 is provided in parallel with the track line on its floor surface.</p> |