发明名称 METHOD FOR CONSTRUCTING REPEATEDLY ELEVATABLE BRIDGE GIRDER BEARING PART BY QUICK ELEVATION AND STEEL FORM
摘要 PROBLEM TO BE SOLVED: To achieve construction work in a short time and to secure the safety of travel in a short time after the construction work without the need to limit the speeds of traffic. SOLUTION: A stopper 21, made of a steel rod projecting upward through a hole in a plate secured to the bottom surface of a bridge girder, is installed on a pier 1, and a bridge girder bearing part is removed from the bridge girder 1 or a shoe seat to elevate the bridge girder 6 by the required amount. The bridge girder bearing part is shaped to surround the shoe seat and time stopper 21, and a steel form with an edging member formed on its inner surface and with a height-adjustment tool fitted thereto is installed. Then super-quick-curing mortar is poured into the steel form, is integrated with the bridge girder bearing part, and is cured after pouring.
申请公布号 JPH11229323(A) 申请公布日期 1999.08.24
申请号 JP19980037306 申请日期 1998.02.19
申请人 EAST JAPAN RAILWAY CO 发明人 ISHIBASHI TADAYOSHI;FURUYAMA SHOICHI;MATSUDA YOSHINORI;NAKAMURA HIROSHI
分类号 E01D19/04;E01D2/00;E01D101/00;(IPC1-7):E01D19/04 主分类号 E01D19/04
代理机构 代理人
主权项
地址