摘要 |
This invention relates to a process for the execution of the foundation works for buildings erected with prefabricated structures, comprising the realization of a supporting platform in reinforced concrete cast on the ground surface, having the same surface as the plan of the building to be erected, including the external perimetric sidewalks, whose treated surface features a canalization created by using a series of moulds that are removed after the consolidation of the concrete casting, used to fix the external and internal prefabricated panels of the building.
|