发明名称
摘要 PROBLEM TO BE SOLVED: To adjust an initial tension and increase the strength of a girder, by providing a retard-curing adhesive-filling layer in a bondless portion, in a pretension type prestressed concrete girder in which PC steel members with bondless portions are arranged. SOLUTION: A prestressed concrete follower girder is provided with PC steel materials 2, primary bond control steel materials 3, and secondary bond control steel materials 5. A retard-curing adhesive is applied at the primary bondless portion 4 and the second bondless portion 6 and it is covered with a sheath. After concrete has been placed, the girder 1 is cured with steam and prestresses are applied. In the meantime, the bond control steel materials 3, 5 contract freely to release the tension without adhesion with the girder. Thereafter, the adhesive is cured in accordance with the elapsed time to join the girder concrete and the bond control steel materials 3, 5 together as a unit. Accordingly, corrosion due to voids is eliminated and the bond control materials function as axial steel materials and shearing reinforcements.
申请公布号 JP2928474(B2) 申请公布日期 1999.08.03
申请号 JP19950226593 申请日期 1995.09.04
申请人 PII ESU KK 发明人 NOMURA SADAHIRO
分类号 E04C3/26;E01D1/00;E01D2/00;E01D101/26;E01D101/28;(IPC1-7):E01D2/00 主分类号 E04C3/26
代理机构 代理人
主权项
地址