发明名称 WORK PRODUCTION
摘要 <p>PROBLEM TO BE SOLVED: To decrease the number of stocks between both of a lot production process and a sequential production process, in a production line where they are continuous to each other. SOLUTION: When passing of an engine compartment is detected, engine compartment passing data are outputted (S1), and a coating production plan and a molding production plan are prepared (S2). An indication for molding (S3), an indication for carrying an empty car in PBS (S4), and an indication for carrying the empty car out of a jig storage are outputted (S5). A bumper is taken out (S6), and if its quality is discriminated as NG, it is removed (S7, S8). The empty car is carried into a cleaning arrival place from the jig storage (S9). The bumper after cleaning arrival is unloaded, stocked, and delivered to a vehicle shop according to delivery instructions (S10-S12).</p>
申请公布号 JPH11165667(A) 申请公布日期 1999.06.22
申请号 JP19970336077 申请日期 1997.12.05
申请人 NISSAN MOTOR CO LTD 发明人 DOUMIKI MUTSUMI
分类号 B23P21/00;B23Q41/08;B62D65/00;B62D65/18;B65G61/00;G05B15/02;G05B19/418;G06Q50/00;G06Q50/04;(IPC1-7):B62D65/00;G06F17/60 主分类号 B23P21/00
代理机构 代理人
主权项
地址