发明名称 SHEET METAL MEMBER COST ESTIMATING AND ORDERING SYSTEM
摘要 PROBLEM TO BE SOLVED: To enable even a person unskilled in personal computer operation to easily operate a personal computer while minimizing contents to be keyed in when preparing the estimate of construction member material cost or working cost by displaying an estimate screen by clicking a required material name from various material forms on a screen, and automatically calculating the working cost or the like only by changing a material dimension to a design dimension. SOLUTION: In input processing 1, a material form name and a material name or the like are inputted. In estimate calculation processing 2 by members and estimate issue processing 3, the cost is estimated for every construction member. In material sort processing 4, the same material is collected for performing the ordering job of materials. Further, this system is provided with order statement issue processing 5 and a material form/material file 6. When various material forms are displayed on the screen, and any required material form is selected, the detailed material name of that material form is displayed on the screen and by clicking the required material name, the material name and the material dimension or the like are displayed on the screen of the estimate. Then, the working cost or the like is automatically calculated only by changing the material dimension to the design dimension.
申请公布号 JPH11110442(A) 申请公布日期 1999.04.23
申请号 JP19970275531 申请日期 1997.10.08
申请人 HITACHI LTD 发明人 OYAMA AKIHIRO;WATARI HIROYUKI
分类号 G06Q50/04;G06Q30/06;G06Q50/00 主分类号 G06Q50/04
代理机构 代理人
主权项
地址
您可能感兴趣的专利