摘要 |
<p>PROBLEM TO BE SOLVED: To improve productivity (the possible number of production) of a system, and find out a bottleneck process before constructing the system by finding out the bottleneck process by assembling carrying and facility with each other in an inter-facility unmanned carrying system. SOLUTION: The productivity of a system is improved, and a bottleneck process is found out before constructing the system by providing with a step 1 for judging whether the carrying capacity of an unmanned carrying system is a bottleneck or not, a step 8 for judging whether the facility capacity is a bottleneck by process or not, and a step 4 for judging whether or not a moment when both of a carrying capacity and a facility capacity are taken into consideration in each process becomes a bottleneck.</p> |