发明名称 SOOT BLOWER OPERATING METHOD OF WASTE HEAT RECOVERY BOILER
摘要 PROBLEM TO BE SOLVED: To prevent a drop definitely in heat transfer efficiency and waste heat recovery efficiency applied to a steel material by detecting automatically dust deposited on a boiler heat transfer tube for a waste heat recovery boiler set up in a steel material heating furnace in an early stage and definitely and preventing drain water from being injected to the boiler heat transfer tube when staring a soot blower and preventing the dust from being condensed and fixed and holding constantly a draft force of a heating furnace stack and so forth. SOLUTION: An exhaust gas pressure loss (differential pressure on the inlet side)ΔP in a waste heat collection boiler 4 is measured with a measuring apparatus 11. When this waste gas pressure lossΔP exceeds a setting value, a soot blower 5 is arranged to start. When starting the soot blower 5, the steam of the soot blower 5 is injected for a definite time in the direction in which the steam is not injected to a boiler heat transfer tube 4a so that the water in the soot blower 5 and the piping may be purged. After the water is purged, the steam is injected toward the boiler heat transfer tube 4a.
申请公布号 JPH10274408(A) 申请公布日期 1998.10.13
申请号 JP19970325862 申请日期 1997.11.27
申请人 SUMITOMO METAL IND LTD 发明人 WAKUTA KENICHIRO;KIMURA TAKESHI
分类号 F23J3/00;(IPC1-7):F23J3/00 主分类号 F23J3/00
代理机构 代理人
主权项
地址