摘要 |
A method and article for sealing a manhole riser, a catch basin, and a pipe juncture. The method is an economical process whereby elastomeric bands are placed around and inside a manhole riser, a catch basin, or a pipe juncture and effectively seals the manhole riser, catch basin, or pipe juncture from loss of water or infiltration of water and other contaminants such as gases and salt.
|