The method involves detecting an open load condition and/or a load interruption of a smart switch (1) at whose output (3) a load (RL) is connected, through evaluating the load status derived by its load driver output when switching the smart switch off. A load detection is activated for a predetermined time after switching the smart switch off. The load detection is alternatively or in addition activated for a predetermined time before switching the smart switch on. The smart switch may be a multiple switch, consisting of several individual smart switches, whereby the load detection is activated for each smart switch individually after the switching off and/or before the switching on. The predetermined period is preferably 200 mu s.
申请公布号
DE19705339(A1)
申请公布日期
1998.08.27
申请号
DE19971005339
申请日期
1997.02.12
申请人
SIEMENS AG, 80333 MUENCHEN, DE
发明人
GRAF, ALFONS, DR., 86916 KAUFERING, DE;SCHMID, HORST, 81739 MUENCHEN, DE