发明名称 BATTERIESYSTEM UND VERWENDUNG IN EINEM SCHRITTSCHALTWERK
摘要 A battery system for supplying electric energy from a primary battery or a secondary battery to a load (L). This system includes a battery consisting of the primary battery or the secondary battery, an electric double layer capacitor (3) for storing electric energy from the battery, a limiting resistor (2) for limiting the electric energy supplied from the battery to the electric double layer capacitor (3), and a discharge controller (4) for controlling the electric double layer capacitor. The discharge controller (4) causes the electric double layer capacitor (3) to discharge the electric energy to the load intermittently in predetermined cycles while charging the electric double layer capacitor (3). A discharging time for discharging the electric energy from the electric double layer capacitor (3) to the load is shorter than a charging time for charging the electric double layer capacitor (3) with electric energy. At this time, a discharge current is greater than a charge current. <IMAGE>
申请公布号 AT168507(T) 申请公布日期 1998.08.15
申请号 AT19950111331T 申请日期 1995.07.19
申请人 TAGAWASYOUJI CO., LTD. 发明人 FUJII, TAKASHI
分类号 H01G11/00;H01G11/42;H01M10/44;H02J1/00;H02J1/10;H02J7/00;H02J7/34;H02J9/06 主分类号 H01G11/00
代理机构 代理人
主权项
地址