发明名称 FINISHING WORK SCHEDULE CONTROL DEVICE AND ITS USING METHOD
摘要 PROBLEM TO BE SOLVED: To reduce a worker's burden for finishing work schedule control. SOLUTION: When a construction schedule is instructed to be printed, the type of the construction schedule to be printed is judged (200). If the judged type is a construction schedule on construction areawise basis in which working schedules are separately shown by construction areas, construction areas and periods are selected and specified and corresponding data are searched from construction schedule information DB to make bit map data for printing the construction schedule by construction areas (202-220) and print them. If the judged type is a construction schedule on workwise basis in which working schedules are separately shown by working types, working names and periods are selected and specified and corresponding data are searched from the construction schedule information DB to make bit map data for printing the construction schedule by works (230-248) and print them. If the judged type is a construction schedule on jobwise basis in which working schedules are separately shown by worker's jobs, the job names and periods are selected and specified and corresponding data are searched from the construction schedule information DB to make bit map data for printing the construction schedule by jobs (260-278) and print them.
申请公布号 JPH10205130(A) 申请公布日期 1998.08.04
申请号 JP19970009586 申请日期 1997.01.22
申请人 TAKENAKA KOMUTEN CO LTD 发明人 YUASA YOICHI;SASAKI YOSHIKAZU
分类号 E04G21/00;G05B19/418;G06Q10/00;G06Q10/06;G06Q10/10;G06Q50/00;G06Q50/08 主分类号 E04G21/00
代理机构 代理人
主权项
地址