摘要 |
<p>The invention pertains to a method for processing sewage sludge into humus through a complete stuffing cycle, consisting in charging in a first cycle a first polder with sewage sludge up to a set height. Then, the water contents of the liquid sewage sludge is reduced, preferably by draining the first polder and by sowing fine-rooted rapid-growing plants, including pasture grass. The plants in the first polder then enter a growth period, the end of which means the end of the first cycle. Several polders may so be used with a time-shift. The duration of a cycle is approximately 12 months.</p> |
申请人 |
PABSCH, JOACHIM, DIPL.-ING., 31139 HILDESHEIM, DE |
发明人 |
PABSCH, JOACHIM, DIPL.-ING., 31139 HILDESHEIM, DE |