发明名称 Train diagram making-out method
摘要 PROBLEM TO BE SOLVED: To heighten operation efficiency by shunting one train to a shunting station on the basis of an equipment condition on a train diagram prepared track in the case of the generation of an inter-station cross at the time of preparing a train diagram in a single track area including a partial double track area and a shunting station with a sidetrack for train crossing. SOLUTION: When an inter-station cross is generated between stations 2, 3, a priority mode (limited express > express > local > out-of-service) by classification of trains is judged. Departure time from the station 2 and arrival time at the station 3 on a prepared diagram line are computed to shunt a train r1. The arrival time at the station 3 is computed again, and whether an inter- station cross is generated between the same stations as a proceeding train is checked. In the case of no inter-station cross, the computed time is defined, but in the case of an inter-station cross being still generated, the same processing is performed, and departure time from the station 2 and arrival time at the station 3 on the prepared diagram line are computed to shunt a train r2, thus dissolving the inter-station cross.
申请公布号 AU3324497(A) 申请公布日期 1998.07.02
申请号 AU19970033244 申请日期 1997.08.08
申请人 MITSUBISHI DENKI KABUSHIKI KAISHA 发明人 KAZUYUKI GENDA
分类号 B61L27/00;B61L23/22;B61L25/02 主分类号 B61L27/00
代理机构 代理人
主权项
地址