摘要 |
<p>PROBLEM TO BE SOLVED: To absorb shock during the execution of mounting a balustrade efficiently while the balustrade can be mounted at a low cost within a short priod of time. SOLUTION: Bearing holes 2 are bored in the upper surface of a projected thread section 1 of the end edge on a floor slab W of a balcony in the longitudinal direction at specific intervals, adhesive fixed agent 5 is poured into each of the bearing holes 2, and a rod-like bearing material 11 connected to the lower end side of a balustrade post 7 is fitted in each of the bearing holes 2. An elastic body 13 is provided between a downward surface of a plate 12 provided to the bearing material 11 and the upper surface of the projected thread section 1 in a state to adhere to both surfaces respectively, the bearing material 11 is temporarily fixed after the bearing material is leveled, it is left alone for a specific time in a temporarily fixed state to solidify the adhesive fixed agent 5, and the bearing material 11 is fixed and borne.</p> |