发明名称 PRODUCTION SCHEDULE PLANNING METHOD FOR PART FACTORY
摘要 PROBLEM TO BE SOLVED: To make a production schedule for each process automatically by sampling a part to be machined in a (n-1)th process to prepare a machining schedule in the (n-1)th process based on a carry-out schedule depending on process path and a machining schedule of the final process (the (n)th process) and repeating this work. SOLUTION: A machining schedule of a process in which a previous process is a small assembly process is sampled based on a delivery schedule by small assembly part sampling process to prepare a small assembly order schedule. At this time, small assembly delivery time is determined based on small assembly operating time table and small assembly preceding table. Next, a small assembly charging schedule is prepared by scheduling process of a general-purpose scheduler 7 in a machining schedule planning computer 2 based on the small assembly order schedule. Then, a small assembly schedule is prepared by converting form lot for scheduler to actual machining lot based on the small assembly charging schedule and small assembly set part information which is information in which a painted part and a small assembly completed part are combined by small assembly charging lot conversion process.
申请公布号 JPH10156648(A) 申请公布日期 1998.06.16
申请号 JP19960315744 申请日期 1996.11.27
申请人 HONDA MOTOR CO LTD 发明人 OGATA NINKAI;CHAEN KOICHIRO
分类号 B23P21/00;B23Q41/08;B62D65/00;B65G61/00;G05B19/418;G06Q50/00;G06Q50/04 主分类号 B23P21/00
代理机构 代理人
主权项
地址