发明名称 PRODUCTION INSTRUCTION SYSTEM
摘要 <p>PROBLEM TO BE SOLVED: To reduce schedule adjusting man-hour when an equipment gets out of order by discriminating a product kind corresponding to a parts kind which is estimated to be shortage of products by the estimated result of a shortage of product estimation means and instructing an offline of the product kind from a main line. SOLUTION: A workstation 6 determines a car body on which subparts which are estimated to be shortage of products are mounted by a shortage of products estimation result within a file 41, refers to a main line production plan within a file 21, discriminates a car body in which such shortage of products is likely to be generated and prepares rejecting information on such car body by a rejecting vehicle discriminating part 42 as an offline instruction means. The rejecting information prepared is transmitted to an F/M line PLC at the outside, shortage of products information is written on a body so as not to flow a vehicle in which shortage of products is generated on a main line and the vehicle in which shortage of products is generated is automatically rejected at a prescribed rejecting point.</p>
申请公布号 JPH10147268(A) 申请公布日期 1998.06.02
申请号 JP19960306487 申请日期 1996.11.18
申请人 NISSAN MOTOR CO LTD 发明人 YOKOYAMA MASAHARU
分类号 B23Q41/08;B62D65/00;B62D65/18;B65G61/00;G05B19/418;G05B23/02;G06F17/00;G06Q10/00;G06Q10/04;G06Q50/00;G06Q50/04;G06Q50/10;(IPC1-7):B62D65/00;G06F17/60 主分类号 B23Q41/08
代理机构 代理人
主权项
地址