The procedure switches heater (15) periodically on and off according to the measured temperature. The heating output is controlled by the temperature through pulsed operation, the pulse duration being changed according to the temperature. First there is a pulse and then a follow-up pulse sequence. The first pulse lasts from 4 to 6 min., preferably 5 min. Then comes one lasting 2 to 8 sec., preferably 4 sec. Then comes a switch-off period of between 4 and 8 sec., preferably 6 sec. The heater is a tubular radiant one on the evaporator. There is circulatory cooling.
申请公布号
DE19645182(A1)
申请公布日期
1998.05.07
申请号
DE19961045182
申请日期
1996.11.02
申请人
AEG HAUSGERAETE GMBH, 90429 NUERNBERG, DE
发明人
HORN, KLAUS, DIPL.-ING., 37296 RINGGAU, DE;DUNGLER, HANS, DIPL.-ING., 34253 LOHFELDEN, DE